If a term you need isn't here, get in touch via
hello@marsadcomply.com
and we'll add it.
A note on the wording. "Important",
"Critical", and "Material" are not synonyms. Each carries a specific meaning the regulator expects to see used precisely.
Where SAMA defines a term, this glossary uses SAMA's word; where
SAMA delegates to the bank (common for thresholds and numeric
bands), the glossary marks the distinction.
A–C
- Accountable Executive (AE)
- The named senior owner of an outcome, typically used in
MVB and framework sign-off. Sits in parallel with the CRO
on dual-signoff declarations.
- Action
- A piece of remediation work tied to a finding, with an
owner, a due date, and a workflow state. Lives under the
"Findings & actions" pillar.
- Attestation
- A periodic confirmation by an owner that a control or a
service is operating as expected. Has a cycle (monthly,
quarterly, etc.) and a sign-off ledger attached.
- Audit log
- Append-only record of state changes, comments, and
ownership transfers on every workflow-bearing artefact.
Surfaces on artefact pages as the timeline panel.
- BCM
- SAMA Business Continuity Management framework. One of
the framework lenses MARSAD ships; the foundation for
recovery-objective requirements and the BIA mandate.
- BIA: Business Impact Analysis
- Structured assessment of the impact of disruption to a
business activity. Produces criticality classifications and
recovery objectives. Mandated by SAMA BCM 2.4 as the
foundation of the BCM programme; banks produce it themselves; MARSAD captures the outputs but does not generate the BIA.
- BIAN landscape
- An industry-standard service-domain map (BIAN: Banking
Industry Architecture Network). MARSAD uses it as a shared
reference frame so IBS registers are comparable across
banks and across regulator conversations.
- CBS: Critical Business Service
- A service that is internally critical to the bank's
operations but is not customer-facing in the IBS sense.
Examples: regulatory reporting infrastructure, Treasury risk
engines, GL / financial accounting. Distinct from IBS, which
carries the customer-facing orientation. SAMA anchor: ITGF
3.2.1-CR5's three-tier IT asset scale (mission critical /
critical / non-critical).
- Critical
- In SAMA framing, internal continuity orientation: if this fails, the bank can't operate. The "C" in CBS / CBF.
Distinct from "Important" (customer-facing) and "Material"
(regulatory trigger or financial threshold).
- Cross-walk
- The mapping between a control in one framework and the
related controls in other frameworks. Lets a bank avoid
contradicting itself across overlapping lenses.
- CSF
- SAMA Cyber Security Framework. One of the framework
lenses MARSAD ships out of the box.
- CRFR
- SAMA Cyber Resilience Framework. Successor / sibling to
CSF, focused on the resilience dimension of cyber.
- CRO
- Chief Risk Officer. Typically signs every MVB
declaration in parallel with the Accountable Executive.
D–F
- Declaration
- A scoped, signed statement of the bank's position, most
often used for MVB. Has scope, operating attributes,
signatories, and a sign-off ledger.
- Drill
- A test against a declared MVB or against a specific
resilience scenario. Outcomes attach back to the
declaration that scoped them.
- Evidence pack
- A bundled, signed export (PDF for reading, JSON for computing, plus a verifiable proof) walking a regulator
through a service or a cycle's artefacts: scope,
signatories, tests, findings, attestations.
- Finding
- A point where a control, a test, or an attestation has
surfaced something that needs work. Findings flow into
actions, which carry ownership and due dates.
- Framework lens
- One of the SAMA frameworks (ITGF, CSF, CRFR, BCM,
Counter-Fraud, Outsourcing) loaded into MARSAD as a
structured catalogue, assessed on a recurring cycle.
I–M
- IBS: Important Business Service
- A service whose disruption would meaningfully impact
customers, the bank, or the financial system. The unit of
OpRes work, the spine of the platform.
- IBS register
- The full list of identified IBS, with the rationale,
owners, and review cadence preserved alongside the entries.
- Important
- Customer / external orientation: if this fails, customers or financial stability suffer. The "I" in IBS.
Distinct from "Critical" (internal continuity) and "Material"
(regulatory trigger or financial threshold).
- ITGF
- SAMA IT Governance Framework. The first framework lens
MARSAD shipped, focused on IT governance posture.
- Material
- In SAMA framing, "material" is a regulatory review
trigger ("material change", "material outsourcing"). MARSAD's
IBS scoring criterion was originally named "financial
materiality" (industry usage) and was renamed to
financial impact in 2026 to eliminate the
dissonance against SAMA's vocabulary. The criterion measures
the financial exposure if the service fails (magnitude), not a regulatory trigger.
- Maturity ladder
- The graduated stages used by the maturity roadmap, from
"starting out" through to "advanced steady state".
- Mission critical / Critical / Non-critical
- SAMA ITGF 3.2.1-CR5's three-tier IT asset classification.
Mission-critical and critical assets reviewed at least
annually; non-critical reviewed based on importance to the
business. The only explicit SAMA-defined service tiering
across the loaded framework set; MARSAD's taxonomy maps onto
these tiers.
- MVB: Minimum Viable Bank
- The declared floor of services that must remain
available under stress. A scoped subset of the IBS
register, signed by CRO and AE, drilled regularly.
- MTPD / MAO
- Maximum Tolerable Period of Disruption / Maximum
Acceptable Outage. The outermost time band before
disruption to an IBS becomes intolerable. SAMA BCM 2.4-3
mandates the definition; thresholds are bank-defined; SAMA does not stipulate numeric bands.
O–S
- Operational twin
- MARSAD's category claim: a living model of the bank that
has to keep running, distinct from the paper controls that
traditional GRC platforms manage. Bounded to operational resilience (services, dependencies, blast radius, resilience state, obligations) but not financial, customer, or treasury twinning. Faithfulness, freshness, time-queryability, and
simulation-capability are the four axes that make the claim
defensible.
- OpRes
- Operational resilience. The discipline SAMA's framework
asks regulated entities to operate, and the spine MARSAD is
organised around.
- OpRes lifecycle
- The recurring identify → map → test → declare →
evidence cycle. See the
OpRes lifecycle page.
- Outcome category
- A label on each IBS describing the type of customer or
systemic outcome the service delivers. Used to group the
register and to ensure scorecards aren't dominated by one
category.
- Pillar
- One of the four governance pillars MARSAD organises
day-to-day work around: Findings & actions, Periodic
attestations, Resilience tests, Third parties.
- Risk appetite
- The bank's stated tolerance for risk, owned by the CRO
function and approved by the board. SAMA anchor: Counter-
Fraud 4.2 requires definition along organisation impact and
customer impact dimensions, with CEO / Board escalation on
breach. MARSAD surfaces the appetite as soft guidance when admins set thresholds or score IBS; the statement is the binding authority.
- SAMA
- Saudi Central Bank, the regulator whose frameworks
MARSAD is shaped around.
- Severity 1-5
- MARSAD's internal scale for findings and incidents:
1 insignificant, 2 minor, 3 moderate, 4 major, 5
catastrophic. SAMA bridge: BCM 2.11-1 mandates reporting at
"Medium" or "High"; MARSAD's bridge is severity 4-5 ≈ High,
severity 3 ≈ Medium. The 1-5 is for operational granularity;
the bridge governs regulator submission.
- Significant
- Middle-tier term in some frameworks between "material"
and "immaterial". SAMA framework data does not define it as
a category; MARSAD does not use it as a classification level.
Included here for clarity when it surfaces in external
documents.
- Sovereign-mandated services
- Services mandated by SAMA that are operationally
non-negotiable for any participating bank, SARIE, SADAD,
SPAN, mada, IPS, Etimad. Bypass MVB scoping gates.
- Supporting service
- A service that underpins one or more IBS or CBS but is
not critical in its own right. Examples: CIAM, message bus,
settlement engine, KYC. SAMA anchor: ITGF 3.2.1-CR5's
"non-critical information assets … assessed based on their
importance to the business", the qualifier that separates a
supporting service from a non-critical / out-of-scope one.
T–W
- Third party
- An external supplier or partner that an IBS depends on.
Lives under the "Vendors" pillar; incidents that touch an
IBS thread back to that service's record.
- Trend signal
- A measurable indicator the maturity roadmap watches, e.g. test pass rate, finding closure rate. Trend, not
point-in-time.
- Workflow template
- A configurable review-and-sign-off pattern attached to
an artefact type. Different artefacts get different
templates; admins can tune per framework.